SHEET 08Service Line 08

Remodeling & Additions

Kitchen and bathroom remodels, room additions, wall removal, and whole-home renovation, run so the house stays livable while we work.

Scope of Work — Remodeling & Additions

What we do and how

Quick Answer

Sentinel Home Solutions is a veteran owned contractor providing remodeling and additions services across the South Carolina Upstate from its base in 151 Glenwood Ln, Gray Court, SC 29645. Kitchen and bathroom remodels, room additions, wall removal, and whole-home renovation, run so the house stays livable while we work. Typical duration is 3 weeks – 6 months, work is quoted from a written line-item scope, and the initial site assessment is free.

Remodeling an existing house is a different job from building a new one, and treating them the same is how budgets blow up. Nobody knows exactly what is behind a wall until it is open, so we budget for discovery instead of hoping. Opening a wall, moving a kitchen, or finishing a bonus room usually touches structure, ductwork, and electrical at the same time, and we would rather own all three than coordinate between subcontractors who each assume someone else is handling it. The other half of this work is that you still live here. Dust containment, protected walk paths, and daily cleanup are line items in our scope, not favors we do when there is time.

Line Items

01Kitchen remodeling and layout changes
02Bathroom gut and rebuild with waterproofing
03Room additions and bonus room buildouts
04Load-bearing wall removal with engineered beams
05Basement and attic finishing
06Whole-home renovation
07Mechanical, electrical, and plumbing rerouting
08Dust containment for occupied homes
09Interior finishes, cabinetry, and trim
10Documented punch list and walkthrough
Our Position

Remodeling is a different job from building new, and the difference is that nobody knows what is behind the wall until it is open. We budget for that honestly, and we keep the house livable while we work.

Field Findings

Why remodel budgets change mid-project

A remodel quote with no contingency line is a quote that will change. Older Upstate homes hide undersized wiring, failed subfloor, corroded supply lines, and load-bearing walls where nobody expected them. The honest approach is to budget for discovery and document what we find, rather than to present a low number and revise it after demolition.

Structural and mechanical work done properly behind the finishes, because that is where remodels fail.
Structural and mechanical work done properly behind the finishes, because that is where remodels fail.

What We Find Most Often

01

Unknowns priced as zero

A contractor who carries no contingency for concealed conditions is not cheaper. They have simply moved the cost to a change order you have not seen yet.

02

Finish work over unaddressed problems

New tile over a soft subfloor and new cabinets over failed plumbing look finished for about a year. We open it, show you, and price the repair before covering it.

03

Layout changes treated as finish work

Moving a sink, a range, or a wall is a mechanical and structural project. Quotes that treat it as cosmetic are the ones that grow.

04

No plan for living in the house

Dust in the return, no protected path to the bedrooms, tools left across the kitchen for six weeks. Containment and daily cleanup are scope items, not courtesies.

Sequence of Work — 9 Stages

How a remodeling and additions project runs

Every stage is documented. You are never guessing what happened on a day you were not home.

01

Existing conditions review

We review the house you actually have: structure, panel capacity, ductwork, plumbing age, and what the walls are likely hiding. This is the step that prevents most mid-project surprises.

02

Scope and budget range

A realistic range for the work you are describing, with the contingency stated as a number rather than buried, so you know what the plan is if demolition finds something.

03

Design and selections

Layout, cabinetry, tile, and fixtures decided with lead times in mind. Cabinets and specialty tile get ordered before demolition rather than after, because that is what stretches a remodel.

04

Engineering and permits where required

Removing load requires engineering, a beam sized for the span, and support down to the foundation. That gets drawn, permitted, and inspected rather than judged by eye.

05

Containment and protection

Dust barriers, sealed returns, floor protection, and a protected walk path before any demolition starts, so the part of the house you are still living in stays usable.

06

Demolition and documented findings

We open it up, photograph what we find, and tell you the same day if a concealed condition changes the scope. Findings are shown to you, not discovered on the invoice.

07

Structural, mechanical, and rough-in

Beams set, walls framed, and ductwork, wiring, and plumbing rerouted and inspected before anything gets closed up.

08

Finishes and weekly reporting

Waterproofing, tile, cabinetry, trim, and paint, with weekly written updates including photographs and budget movement.

09

Punch list and cleanup

Final walkthrough with you present, punch list closed before final invoicing, and the house returned clean rather than swept.

Specification Options

Remodeling project types

Every one of these touches structure, mechanicals, or both. That is why we would rather own all the trades than coordinate around them.

01

Kitchen remodel

Layout changes, cabinetry, counters, lighting, and the electrical and plumbing work behind them. Moving a sink or a range is a mechanical project as much as a finish one.

Dated or closed-off kitchens
02

Bathroom remodel

Full gut and rebuild with proper waterproofing behind the tile. The failures we get called to fix are almost always waterproofing, not tile work.

Leaks, dated baths
03

Wall removal and open concept

Removing walls, setting engineered beams, and reworking the ductwork and electrical that lived inside them. Permitted and inspected where load is involved.

Closed floor plans
04

Room addition

Where the new structure ties into the existing one is what determines whether an addition performs. Roof, wall, and HVAC transitions are the whole job.

Growing families
05

Bonus room and basement finishing

Unfinished space converted to conditioned living space, which means insulation, HVAC capacity, egress, and moisture control, not just drywall.

Adding space without adding footprint
06

Whole-home renovation

Down to studs and rebuilt. Often better value than new construction on a good lot, and it carries the most unknowns until demolition opens things up.

Good lot, dated house
07

Aging-in-place modifications

Curbless showers, widened doorways, blocking set for grab bars, and lighting and threshold changes done as construction rather than as add-on hardware.

Staying in the house long term
Understanding Cost

What determines the price of a remodel

On a remodel, what the house is hiding matters as much as what you are choosing. These are the variables that decide the number, and the ones to press any contractor on.

Why We Do Not List Prices

A price on a website is a guess about a house nobody has looked at. We would rather tell you what moves the number, then measure your house and put a fixed figure in writing. The assessment is free and there is no obligation attached to it.

Get your written price

What Moves Your Number

01

What demolition uncovers

Older homes hide failed plumbing, undersized wiring, and rot. A remodel budget without a stated contingency is a budget that will be exceeded.
02

Whether the layout changes

Replacing fixtures in place is finish work. Moving a kitchen sink, relocating a range, or adding a bathroom means rerouting drains, supply, and circuits, and costs multiples more.
03

Structural changes

Removing a load-bearing wall requires engineering, a beam, and often foundation work below the posts. This is a category of cost, not a small line item.
04

Finish level

Cabinetry, counters, tile, and fixtures span an enormous range. The same kitchen footprint can differ by a factor of three based on selections alone.
05

Age of the house

Pre-1980 homes in the Upstate frequently need panel work, supply line replacement, or subfloor repair as part of a remodel. That is not scope creep, it is the actual condition.
06

Living in the house during work

Occupied remodels require dust containment, phasing, and daily cleanup so the home stays usable. That is real labor and it belongs in the price.
07

Permitting and jurisdiction

Requirements, fees, and review timelines differ between counties and municipalities in the Upstate, which affects both cost and schedule.

Your written scope carries a fixed line-item price. If something is not on the scope, it is not in the price, and we tell you that before you sign.

Scope Boundaries

What is included, and what is not

Included In Scope

  • Existing conditions review before pricing
  • Line-item scope with a stated contingency for concealed conditions
  • Long-lead items ordered before demolition begins
  • Engineering for structural changes where load is involved
  • Permitting and inspection coordination
  • Dust containment, sealed returns, and floor protection
  • Protected walk paths and daily cleanup in occupied homes
  • Photographs of concealed conditions and completed rough-in
  • Weekly written progress reports
  • Documented punch list and final walkthrough
×

Not Included

  • Concealed conditions beyond the stated contingency, priced in writing before the work proceeds
  • Asbestos or lead abatement, which requires a licensed abatement contractor
  • Architectural and engineering fees, unless carried in your contract
  • Permit fees paid to the jurisdiction, unless carried as an allowance
  • Moving or storage of furnishings, unless specified
  • Appliances and furnishings
  • Window treatments and decorating

Exclusions are listed on your written scope with pricing attached where they are likely to come up, so a discovery is never a negotiation.

Accountability

Workmanship

Written, first year

Waterproofing

Documented before tile

Structural

Engineered & inspected

Accountability

One project lead

Common Questions

Remodeling & Additions questions we get asked

If your question is not here, ask it on the intake form below and we will answer it directly rather than sending a brochure.

Q01

How long does a kitchen or bathroom remodel take?

A bathroom is typically three to five weeks and a kitchen six to ten, measured from demolition rather than from contract. Cabinet lead times and late selections are what stretch those numbers, so we order long-lead items before demolition starts rather than after.

Q02

Can we live in the house during a remodel?

For a kitchen, a bathroom, or a single room, usually yes, and we plan for it with dust containment, protected walk paths, and daily cleanup. For a whole-home renovation with the systems down, we will tell you plainly that moving out is faster and cheaper than working around occupancy.

Q03

Can you remove a load-bearing wall?

Yes, and it is engineered rather than estimated. The beam is sized for the span and the load above it, the support path runs down to the foundation, and the work is permitted and inspected. Anyone willing to take out a bearing wall without engineering is telling you something about how they work.

Q04

What happens if you find something unexpected behind the wall?

We photograph it, show you the same day, and price the repair in writing before proceeding. That is what the contingency in your scope is for. What we will not do is cover it up or discover it on your final invoice.

Q05

Is remodeling cheaper than building new?

Usually, and especially on a lot you already like. But a whole-home renovation on a house with failing systems can approach new construction cost with more unknowns, and we will tell you when that line has been crossed rather than sell you the remodel.

Q06

Do you handle additions as well as interior remodels?

Yes. Additions live or die at the tie-in: where the new roof meets the old one, where the wall assemblies join, and whether the existing HVAC can carry the added load. Since we do roofing, exteriors, and HVAC in house, those transitions are ours to get right.

Form 08Remodeling & Additions

Remodel and addition consultation request

Remodels depend on what your house is actually hiding. The more you can tell us about the existing home, the more useful our first conversation will be.

Active Damage Or Unusable Room

If a bathroom or kitchen is out of service, or you have active water damage, call directly rather than waiting on a form.

(864) 593-8773

Work Order 08 — Intake

Free · No Obligation

01What are we remodeling *

Select all that apply.

02How old is the house *

Age tells us what to expect behind the walls: wiring, plumbing, and structure.

03Does the project involve any of these

Select all that apply. These determine whether engineering and permits are required.

04Will you be living in the home during the work *

This changes how we phase the work and what containment we set up.

05Any known problems in the area we are working

Select all that apply. Knowing now is far cheaper than finding out at demolition.

06Do you have a design or plans
07Working budget range

A range is fine. It tells us what is realistic before anyone spends time on drawings.

08When do you want to start
09Financing status
10Tell us about the project

Response within 1 business day

SHEET 09 — NEXT STEP

Get it looked at
before it spreads.

Tell us what the house is doing and we will come look at it. The assessment is free, the findings come to you in writing, and there is no obligation attached to either one.