Assessment
We review the existing room, your goals, access, protection needs, visible conditions, likely discovery, and how adjacent spaces are affected.
Kitchens, baths, additions, and whole-home renovation
Nobody knows exactly what is behind a wall until it is open, so we budget for discovery up front instead of writing a change order later. Dust containment, protected walk paths, and daily cleanup are line items in our scope, not favors we do when there is time.
Existing homes have histories behind the walls. The scope needs to respect actual framing, wiring, plumbing, ductwork, moisture, access, occupied spaces, and the finish work that follows.
We assess the room, structure, moisture, access, utilities, finishes, adjacent spaces, and the conditions that can affect the work once it starts.
Occupied areas, walk paths, dust control, demolition, material staging, and trade sequence are written into the project plan before work begins.
Framing, waterproofing, electrical, plumbing, HVAC, windows, exterior details, and load-bearing changes are coordinated with the finished room.
Cabinetry, tile, trim, fixtures, paint, walkthrough items, and handoff are managed against documented selections and scope decisions.
We review the existing room, your goals, access, protection needs, visible conditions, likely discovery, and how adjacent spaces are affected.
You see what is included, allowances, selections, protection, trade coordination, demolition, known conditions, and discovery assumptions.
Protection, demolition, structural work, systems, waterproofing, finishes, inspections, cleanup, and quality checks follow the written sequence.
We review the completed work, remaining items, finish details, and handoff so the renovation closes with a clear record.
Bathrooms, kitchens, openings, exterior walls, roof lines, and transitions receive the waterproofing and flashing details their location requires.
Load-bearing changes, framing conditions, floor transitions, access, protection, and jobsite sequence are addressed before finishes hide the work.
Electrical, plumbing, HVAC, lighting, appliance, and control decisions are coordinated with the actual framing and the final room layout.
Dust containment, protected walk paths, daily cleanup, material staging, and communication are planned for a home that is still in use.
A responsible remodeling number starts with the existing conditions, access, protection, structural and system changes, waterproofing, finish selections, allowances, and the discovery that cannot be seen until the work is opened.
Existing conditions behind a wall, ceiling, floor, or finish are not always visible beforehand. Calling out likely discovery is more honest than hiding it and surprising you later.
Protection, dust containment, walk paths, material staging, daily cleanup, and communication are included in the project sequence rather than treated as an afterthought.
Yes. Load-bearing work, waterproofing, electrical, plumbing, HVAC, openings, exterior transitions, and finish work are coordinated around the existing home.
A responsible remodeling scope needs the existing room, conditions, access, discovery risk, selected finishes, systems, and intended work to be reviewed.
Start the request here. The existing Sentinel HighLevel assessment form will record your details for follow-up.
Start with a documented remodeling conversation and a written scope built for the existing house.